  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

  

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

  

信息流廣告 競(jìng)價(jià)托管 招生通 周易 易經(jīng) 代理招生 二手車(chē) 網(wǎng)絡(luò)推廣 自學(xué)教程 招生代理 旅游攻略 非物質(zhì)文化遺產(chǎn) 河北信息網(wǎng) 石家莊人才網(wǎng) 買(mǎi)車(chē)咨詢(xún) 河北人才網(wǎng) 精雕圖 戲曲下載 河北生活網(wǎng) 好書(shū)推薦 工作計(jì)劃 游戲攻略 心理測(cè)試 石家莊網(wǎng)絡(luò)推廣 石家莊招聘 石家莊網(wǎng)絡(luò)營(yíng)銷(xiāo) 培訓(xùn)網(wǎng) 好做題 游戲攻略 考研真題 代理招生 心理咨詢(xún) 游戲攻略 興趣愛(ài)好 網(wǎng)絡(luò)知識(shí) 品牌營(yíng)銷(xiāo) 商標(biāo)交易 游戲攻略 短視頻代運(yùn)營(yíng) 秦皇島人才網(wǎng) PS修圖 寶寶起名 零基礎(chǔ)學(xué)習(xí)電腦 電商設(shè)計(jì) 職業(yè)培訓(xùn) 免費(fèi)發(fā)布信息 服裝服飾 律師咨詢(xún) 搜救犬 Chat GPT中文版 語(yǔ)料庫(kù) 范文網(wǎng) 工作總結(jié) 二手車(chē)估價(jià) 情侶網(wǎng)名 愛(ài)采購(gòu)代運(yùn)營(yíng) 情感文案 古詩(shī)詞 邯鄲人才網(wǎng) 鐵皮房 衡水人才網(wǎng) 石家莊點(diǎn)痣 微信運(yùn)營(yíng) 養(yǎng)花 名酒回收 石家莊代理記賬 女士發(fā)型 搜搜作文 石家莊人才網(wǎng) 銅雕 關(guān)鍵詞優(yōu)化 圍棋 chatGPT 讀后感 玄機(jī)派 企業(yè)服務(wù) 法律咨詢(xún) chatGPT國(guó)內(nèi)版 chatGPT官網(wǎng) 勵(lì)志名言 兒童文學(xué) 河北代理記賬公司 教育培訓(xùn) 游戲推薦 抖音代運(yùn)營(yíng) 朋友圈文案 男士發(fā)型 培訓(xùn)招生 文玩 大可如意 保定人才網(wǎng) 黃金回收 承德人才網(wǎng) 石家莊人才網(wǎng) 模型機(jī) 高度酒 沐盛有禮 公司注冊(cè) 造紙術(shù) 唐山人才網(wǎng) 沐盛傳媒
主站蜘蛛池模板: 石家庄律师_石家庄刑事辩护律师_石家庄取保候审-河北万垚律师事务所 | 二手回收公司_销毁处理公司_设备回收公司-找回收信息网 | 标准品网_标准品信息网_【中检计量】| 卫生型双针压力表-高温防腐差压表-安徽康泰电气有限公司 | 东莞ERP软件_广州云ERP_中山ERP_台湾工厂erp系统-广东顺景软件科技有限公司 | _网名词典_网名大全_qq网名_情侣网名_个性网名 | 合金耐磨锤头_破碎机锤头_郑州市德勤建材有限公司 | 网站seo优化_seo云优化_搜索引擎seo_启新网络服务中心 | 动库网动库商城-体育用品专卖店:羽毛球,乒乓球拍,网球,户外装备,运动鞋,运动包,运动服饰专卖店-正品运动品网上商城动库商城网 - 动库商城 | 上海物流公司,上海货运公司,上海物流专线-优骐物流公司 | 广东机电安装工程_中央空调工程_东莞装饰装修-广东粤标建设有限公司 | 润滑脂-高温润滑脂-轴承润滑脂-食品级润滑油-索科润滑油脂厂家 | 一技任务网_有一技之长,就来技术任务网 | 寮步纸箱厂_东莞纸箱厂 _东莞纸箱加工厂-东莞市寮步恒辉纸制品厂 | 沥青灌缝机_路面灌缝机_道路灌缝机_沥青灌缝机厂家_济宁萨奥机械有限公司 | SRRC认证_电磁兼容_EMC测试整改_FCC认证_SDOC认证-深圳市环测威检测技术有限公司 | 双能x射线骨密度检测仪_dxa骨密度仪_双能x线骨密度仪_品牌厂家【品源医疗】 | 海外仓系统|国际货代系统|退货换标系统|WMS仓储系统|海豚云 | bng防爆挠性连接管-定做金属防爆挠性管-依客思防爆科技 | 济南ISO9000认证咨询代理公司,ISO9001认证,CMA实验室认证,ISO/TS16949认证,服务体系认证,资产管理体系认证,SC食品生产许可证- 济南创远企业管理咨询有限公司 郑州电线电缆厂家-防火|低压|低烟无卤电缆-河南明星电缆 | 西门子气候补偿器,锅炉气候补偿器-陕西沃信机电工程有限公司 | 防勒索软件_数据防泄密_Trellix(原McAfee)核心代理商_Trellix(原Fireeye)售后-广州文智信息科技有限公司 | 郑州墨香品牌设计公司|品牌全案VI设计公司 | 安德建奇火花机-阿奇夏米尔慢走丝|高维|发那科-北京杰森柏汇 | 南京交通事故律师-专打交通事故的南京律师| 上海恒驭仪器有限公司-实验室平板硫化机-小型平板硫化机-全自动平板硫化机 | 旋振筛|圆形摇摆筛|直线振动筛|滚筒筛|压榨机|河南天众机械设备有限公司 | GAST/BRIWATEC/CINCINNATI/KARL-KLEIN/ZIEHL-ABEGG风机|亚喜科技 | 掺铥光纤放大器-C/L波段光纤放大器-小信号光纤放大器-合肥脉锐光电技术有限公司 | 全国冰箱|空调|洗衣机|热水器|燃气灶维修服务平台-百修家电 | 槽钢冲孔机,槽钢三面冲,带钢冲孔机-山东兴田阳光智能装备股份有限公司 | 磁棒电感生产厂家-电感器厂家-电感定制-贴片功率电感供应商-棒形电感生产厂家-苏州谷景电子有限公司 | 双菱电缆-广州电缆厂_广州电缆厂有限公司 | 美国PARKER齿轮泵,美国PARKER柱塞泵,美国PARKER叶片泵,美国PARKER电磁阀,美国PARKER比例阀-上海维特锐实业发展有限公司二部 | led冷热冲击试验箱_LED高低温冲击试验箱_老化试验箱-爱佩百科 | 广域铭岛Geega(际嘉)工业互联网平台-以数字科技引领行业跃迁 | 浙江红酒库-冰雕库-气调库-茶叶库安装-医药疫苗冷库-食品物流恒温恒湿车间-杭州领顺实业有限公司 | 电机铸铝配件_汽车压铸铝合金件_发动机压铸件_青岛颖圣赫机械有限公司 | 暖气片十大品牌厂家_铜铝复合暖气片厂家_暖气片什么牌子好_欣鑫达散热器 | 水平筛厂家-三轴椭圆水平振动筛-泥沙震动筛设备_山东奥凯诺矿机 包装设计公司,产品包装设计|包装制作,包装盒定制厂家-汇包装【官方网站】 | 合肥活动房_安徽活动板房_集成打包箱房厂家-安徽玉强钢结构集成房屋有限公司 |